Value | Category | Cases | |
---|---|---|---|
Local materials (i.e., thatched mud house, wood) | 12157 |
73.4%
|
|
Permanent/fixed structure (i.e., cement, bricks) | 770 |
4.6%
|
|
Semi-permanent structure (mix of pemanent and local materials) | 3640 |
22%
|