| Value | Category | Cases | |
|---|---|---|---|
| 1 | Mud house | 16813 |
71.2%
|
| 2 | Partially built concrete house | 3721 |
15.8%
|
| 3 | Temporary shelter (e.g., tent, makeshift structure) | 1087 |
4.6%
|
| Missing value | 1982 |
8.4%
|