Value | Category | Cases | |
---|---|---|---|
2 windows are in a need of replacement | 1 |
11.1%
|
|
During the implementation identified additional works in the foundation of the house. | 1 |
11.1%
|
|
The amount of cash was not enough to cover all damges; windows, fixing of foundation, etc. Only the cost of 3 windows were 400 USD while the provided amount of cash was only 282 USD. | 1 |
11.1%
|
|
The house should been identified as for Heavy Repair, but done under Medium Repair category. | 1 |
11.1%
|
|
The number of delivered Schiffer is not enough to cover the roof. | 1 |
11.1%
|
|
The second half of the roof and some other minor internal works weren't included in the project. | 1 |
11.1%
|
|
This HR is actually a full reconstruction, also in term of financial requirement. | 1 |
11.1%
|
|
additional window, OSB sheets are needed for a proper repair | 1 |
11.1%
|
|
the part of the roof needs to be repaired - 3 sides of the roof with partial replacement of roofing slates | 1 |
11.1%
|